2019 Events

January
1 Jan – San Pedro Loop Part 1 – 9 miles – 24 stairways – murals
1 Jan – San Pedro Loop Part 2 – 8.6 miles – 24 stairways – murals
5 Jan – LA Loop – Segment O (Red Car Series Walk) – Watts to Naples Island

February
8 Feb – CSULB Century Loop #01 – 8 miles – 140 stairs – 3,688 up-steps [DAG]
16 Feb – Western Silver Lake Loop – 12.5 mi – 51 stairs – 4,127 up-steps [DAG]
22 Feb (Friday) – CSULB Century Loop #02 – 8 miles – 140 stairs – 3,688 up-steps [DAG]

March
2 Mar – Eastern Silver Lake Loop – 13 mi – 51 stairs – 4,445 up-steps – Rain Cancelled
16 Mar – The Wright Stuff – 15 mi – 40 stairs – 1,215 up – 10 FLW/LW designs [DAG]
23 Mar – The Legendary Calabasas Stairs – 7.8 mile hike + stair-climb [DM]
23 Mar – LA Loop Segment N2/O1 with Jane – By invitation only [DAG]
31 Mar – LA Loop Segment O2 with Jane – By invitation only [DAG]

April
6 Apr – Silver Line Express – 2.6 to 19.8 mi – 7 Bus Stations – 26 stairways [DAG]
13 Apr – Women of the WPA – 15.25 mi – stairs sculptures architecture in 3 parts
27 Apr – San Pedro Loop Part 1 – 9 miles – 24 stairways – murals
27 Apr – San Pedro Loop Part 2 – 8.6 miles – 24 stairways – murals

May
11 May – Go with the Flow #1 – Streamline Moderne Architecture – 14.6 mi Map
12 May – Dana Point Stairwalk & History Tour – 9.6mi / 1,326 stairs [DM]  Map

June
1 Jun – 2019 Painted Stairways Tour #1 – 6.7 miles 12 painted stairways [DAG]  Map
22 Jun – 2019 Painted Stairways Tour #1 – 6.7 miles 12 painted stairways [DAG]  Map
29 Jun – Downtown Long Beach Loop – 2.3/5.5/9 mi 48 Stairs History/Arch [DAG] Map

July
13 Jul – Redondo Beach Loop – 8.25 mi 49 stairs 802 up-steps [DAG] Map
27 Jul – Palos Verdes Crest Loop – 9 mi 38 stairs 1,109 up [DAG] Map

August
10 Aug – Palos Verdes Malaga Cove Loop – 5.5 and 7.5 mile options   Map
24 Aug – Naples Island Loops – 8 miles – 20 small stairs – History   Map

September
7 Sep – Go with the Flow #2 – 16.7 mi 80 Streamline Moderne Bldgs  Map